Role & capabilities
- Concept aircraft
- Primary domain
- Air
- System type
- Concept aircraft
- Developer / manufacturer
- Kronshtadt
- Origin / production countries
- Russia
- Other names
- Thunder — Kronshtadt concept
- Variants / configurations
- Public concept; no verified service configuration
- Operators / programme customers
- No operational customer delivery established
Evidence & current status
An announced design or exhibition concept. The reviewed evidence does not establish a flying prototype or operational deployment.
Role & programme
A proposed jet combat-aircraft and collaborative-autonomy concept. It is distinct from the unrelated small Grom multirotor.
GUR identifies the Kronshtadt programme, while CSIS’s 2026 research discusses its earlier command-and-control concept. The reviewed sources do not establish a flying prototype or operational delivery. Conceptual mission roles are therefore not displayed as fielded capabilities. The similarly named small Grom in another GUR record has different manufacturer and performance data.
Sourced specifications
Figures apply to the named configuration. Maximum values are not guaranteed operating performance.
| Specification | Reported value | Context & source |
|---|---|---|
| Airframe | Proposed jet collaborative aircraft | Published supplier specification; configuration and conditions affect performance. Source ↗ |
| Launch / recovery | Not established from the reviewed sources. | Public data gap; no estimate substituted. Follow the source for subsequent releases. Source ↗ |
| Propulsion | Jet propulsion proposed; production engine not verified | Published supplier specification; configuration and conditions affect performance. Source ↗ |
| Dimensions | Not established from the reviewed sources. | Public data gap; no estimate substituted. Follow the source for subsequent releases. Source ↗ |
| Mass | Not established from the reviewed sources. | Public data gap; no estimate substituted. Follow the source for subsequent releases. Source ↗ |
| Endurance | Not established from the reviewed sources. | Public data gap; no estimate substituted. Follow the source for subsequent releases. Source ↗ |
| Range | Not established from the reviewed sources. | Public data gap; no estimate substituted. Follow the source for subsequent releases. Source ↗ |
| Speed | Not established from the reviewed sources. | Public data gap; no estimate substituted. Follow the source for subsequent releases. Source ↗ |
| Altitude | Not established from the reviewed sources. | Public data gap; no estimate substituted. Follow the source for subsequent releases. Source ↗ |
| Payload | Not established from the reviewed sources. | Public data gap; no estimate substituted. Follow the source for subsequent releases. Source ↗ |
| Sensors | Not established from the reviewed sources. | Public data gap; no estimate substituted. Follow the source for subsequent releases. Source ↗ |
| Communications / navigation | Not established from the reviewed sources. | Public data gap; no estimate substituted. Follow the source for subsequent releases. Source ↗ |
Publication history
- — Expanded catalogue profile with sourced specifications, variant distinctions, programme evidence and explicit public data gaps.
Suggest a correction to this entry →
Follow the evidence
Source types identify who makes the claim. Programme milestones and supplier statements should be read in context.
- GUR Kronshtadt Grom identity (opens in a new tab)Government intelligence assessment — Ukraine
- CSIS programme analysis, 2026 (opens in a new tab)Research / analysis