VECTORDEFENCE DRONE
INTELLIGENCE
INDEPENDENT PERSPECTIVE
THE EVOLVING FIELD GUIDE
Editor

Air · Loitering munition

HUNTER 5 / HUNTER 10

Two HUNTER configurations with a shared procurement announcement and clearly separated revision history.

Role & capabilities

  • Loitering munition programme
Order / production commitmentOrder / production commitment
Primary domain
Air
System type
Loitering munition
Developer / manufacturer
HALCON / EDGE
Origin / production countries
United Arab Emirates
Other names
No additional names recorded
Variants / configurations
HUNTER 5 — later gasoline configuration; HUNTER 10; Earlier electric HUNTER 5 — distinct 2022 baseline
Operators / programme customers
UAE Armed Forces — combined family order

Evidence & current status

2022 and 2024 specifications describe materially different baselines; the catalogue does not prove customer acceptance of every revision.

HUNTER 5 and HUNTER 10 are grouped here because the reviewed supplier sheet presents them together, with payload capacity distinguishing the named configurations. This is one family profile, not a claim that the two aircraft have identical dimensions or loading. The joint 2023 UAE order also names HUNTER 2S, which has its own record.

The May 2024 sheet describes gasoline propulsion and a 150-minute endurance baseline. The earlier 2022 HUNTER 5 sheet instead describes a lighter electric configuration with a shorter endurance. These publications cannot be combined into a single timeless specification.

The table below uses the later combined sheet, marking family maxima as such. A customer’s exact configuration, delivery total and acceptance date remain separate questions. When a future release identifies one variant, its facts should be attached to that variant rather than automatically inherited by the other.

Sourced specifications

Figures apply to the named configuration. Maximum values are not guaranteed operating performance.

SpecificationReported valueContext & source
AirframeNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source
Launch / recoveryNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source
PropulsionGasoline engine in the May 2024 family sheetEarlier electric HUNTER 5 is a different published baseline. Source
DimensionsUp to 3.6 m span; up to 2.85 m lengthCombined family maxima. Source
MassUp to 50 kg maximum take-off massCombined family maximum, not necessarily both variants. Source
Endurance150 minutesLater supplier family sheet. Source
Range100 km communications reachNot ferry distance. Source
SpeedNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source
AltitudeNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source
PayloadHUNTER 5: 5 kg; HUNTER 10: 10 kgVariant distinction. Source
SensorsNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source
Communications / navigationNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source

Publication history

  • — Published reference update.

Suggest a correction to this entry

Follow the evidence

Source types identify who makes the claim. Programme milestones and supplier statements should be read in context.

  1. HALCON HUNTER 5 and 10 combined sheet, May 2024 (opens in a new tab)Manufacturer
  2. EDGE HUNTER family UAE contract, 21 February 2023 (opens in a new tab)Manufacturer
  3. Earlier HUNTER 5 sheet, October 2022 (opens in a new tab)Manufacturer

Explore the connections

Manufacturer indexUnited Arab Emirates

EDGE / ADASI

Aircraft and programme links: REACH-S, GARMOOSHA.

Reviewed 20 Sept 2026Read