VECTORDEFENCE DRONE
INTELLIGENCE
INDEPENDENT PERSPECTIVE
THE EVOLVING FIELD GUIDE
Editor

Air · Drone / system

MQ-25A Stingray

A carrier-based unmanned aerial-refuelling programme. Boeing announced the first low-rate production lot of three aircraft on 14 September 2026.

Role & capabilities

  • Multirole aircraft
Order / production commitmentOrder / production commitment
Primary domain
Air
System type
Multirole aircraft
Developer / manufacturer
Boeing
Origin / production countries
United States
Other names
Stingray
Variants / configurations
Engineering Development Models; System Demonstration Test Articles; Lot 1 production aircraft ordered
Operators / programme customers
US Navy — development and production customer

Evidence & current status

The sources below establish the stated programme milestone or supplier claim. They do not independently verify every configuration, delivery total or advertised performance figure.

Role and programme

MQ-25 fills a naval support role: aerial refuelling is the central capability identified by Boeing’s programme announcements. This differentiates the programme from reconnaissance-only aircraft and collaborative fighter demonstrators. A May 2026 Milestone C announcement cleared the programme for low-rate initial production after a production-representative first flight in April.

The September Lot 1 award covers three aircraft. Boeing’s total of 14 under contract includes development and ground-test articles as well as this lot, so it is not a delivered operational fleet. The announcement places initial deliveries and operator training ahead. The reviewed releases do not provide a complete airframe performance table.

Sourced specifications

Figures apply to the named configuration. Maximum values are not guaranteed operating performance.

SpecificationReported valueContext & source
AirframeCarrier-based uncrewed aerial-refuelling aircraftPublished specification for the named configuration. Maxima are not necessarily achievable together. Source ↗
Launch / recoveryCarrier operations planned; qualification programme continuingPublished specification for the named configuration. Maxima are not necessarily achievable together. Source ↗
PropulsionNot established from the reviewed public sources.Public data gap; no estimate or neighbouring variant value substituted. Source ↗
DimensionsNot established from the reviewed public sources.Public data gap; no estimate or neighbouring variant value substituted. Source ↗
MassNot established from the reviewed public sources.Public data gap; no estimate or neighbouring variant value substituted. Source ↗
EnduranceNot established from the reviewed public sources.Public data gap; no estimate or neighbouring variant value substituted. Source ↗
RangeNot established from the reviewed public sources.Public data gap; no estimate or neighbouring variant value substituted. Source ↗
SpeedNot established from the reviewed public sources.Public data gap; no estimate or neighbouring variant value substituted. Source ↗
AltitudeNot established from the reviewed public sources.Public data gap; no estimate or neighbouring variant value substituted. Source ↗
PayloadAerial-refuelling equipment; mass not established by cited releasesPublished specification for the named configuration. Maxima are not necessarily achievable together. Source ↗
SensorsNot established from the reviewed public sources.Public data gap; no estimate or neighbouring variant value substituted. Source ↗
Communications / navigationNot established from the reviewed public sources.Public data gap; no estimate or neighbouring variant value substituted. Source ↗

Documented milestones

  1. First production lot awarded

    Three Lot 1 aircraft contracted; delivery and operational acceptance are separate milestones.

    Read the announcement ↗

Publication history

  • — Added a sourced global catalogue profile with configuration-specific data and explicit evidence limits.

Suggest a correction to this entry →

Follow the evidence

Source types identify who makes the claim. Programme milestones and supplier statements should be read in context.

  1. Boeing Lot 1 award, 14 September 2026 (opens in a new tab)Manufacturer / programme source
  2. Boeing Milestone C announcement, 19 May 2026 (opens in a new tab)Manufacturer / programme source

Explore the connections

Manufacturer indexUnited States

Boeing

Aircraft and programme links: MQ-25A Stingray.

Reviewed 20 Sept 2026Read
Air · Coverage auditNorth America

North America defence drone coverage audit

3 original research topics reviewed: 0 resolved, 3 partially resolved and 0 still open. The remaining register identifies specific evidence needs.

Reviewed 21 Sept 2026Read