VECTORDEFENCE DRONE
INTELLIGENCE
INDEPENDENT PERSPECTIVE
THE EVOLVING FIELD GUIDE
Editor

Air · Reconnaissance aircraft

Orbiter 3

Electric tactical reconnaissance aircraft with a versioned ten-hour supplier baseline and optional VTOL kit.

Role & capabilities

  • Reconnaissance
Supplier-reported statusSupplier-reported status
Primary domain
Air
System type
Reconnaissance aircraft
Developer / manufacturer
Aeronautics
Origin / production countries
Israel
Other names
No additional names recorded
Variants / configurations
Conventional launcher/parachute configuration; Optional VTOL kit — separate performance required
Operators / programme customers
Not identified in reviewed sources

Evidence & current status

Supplier information is attributed; performance and operational acceptance require configuration-specific evidence.

Orbiter 3 is the larger electric member of the Orbiter reconnaissance family. The linked 2026-named brochure specifies a thirty-two-kilogram airframe and a six-kilogram payload allowance. This is a useful current baseline, but it should not be retroactively assigned to all aircraft delivered during the family’s longer history.

Aeronautics separately offers a VTOL kit. The conventional configuration’s ten-hour endurance is not assumed to remain unchanged after adding lifting motors, batteries and other equipment. The product page identifies launcher and parachute recovery for the conventional aircraft.

The supplier lists optical, radar and electronic-intelligence options. Such a menu describes integration possibilities, not one aircraft carrying the entire catalogue simultaneously. A model-specific operator register and VTOL-specific performance remain useful additions. Current communications reach is retained separately from flight duration and total distance.

Sourced specifications

Figures apply to the named configuration. Maximum values are not guaranteed operating performance.

SpecificationReported valueContext & source
AirframeFixed wingCurrent supplier configuration; maxima are not necessarily simultaneous. Source
Launch / recoveryNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source
PropulsionElectricCurrent supplier configuration; maxima are not necessarily simultaneous. Source
Dimensions4.4 m span; 2 m lengthCurrent supplier configuration; maxima are not necessarily simultaneous. Source
Mass32 kg maximum take-offCurrent supplier configuration; maxima are not necessarily simultaneous. Source
EnduranceUp to 10 hours, conventional configurationCurrent supplier configuration; maxima are not necessarily simultaneous. Source
RangeUp to 150 km line-of-sight communications; BLOS optionCurrent supplier configuration; maxima are not necessarily simultaneous. Source
Speed70 knots maximumCurrent supplier configuration; maxima are not necessarily simultaneous. Source
AltitudeNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source
PayloadUp to 6 kgCurrent supplier configuration; maxima are not necessarily simultaneous. Source
SensorsEO/IR, radar and electronic-intelligence optionsCurrent supplier configuration; maxima are not necessarily simultaneous. Source
Communications / navigationNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source

Publication history

  • — Published reference update.

Suggest a correction to this entry

Follow the evidence

Source types identify who makes the claim. Programme milestones and supplier statements should be read in context.

  1. Aeronautics Orbiter 3 current product baseline (opens in a new tab)Manufacturer
  2. Orbiter 3 conventional / VTOL configuration overview (opens in a new tab)Manufacturer

Explore the connections

Manufacturer indexIsrael / Austria

Aeronautics

Systems and source material associated with Aeronautics.

Reviewed 21 Sept 2026Read
Sector

Tactical ISR

Longer observation without a large air base.

Reviewed 20 Sept 2026Read