VECTORDEFENCE DRONE
INTELLIGENCE
INDEPENDENT PERSPECTIVE
THE EVOLVING FIELD GUIDE
Editor

Air · Reconnaissance aircraft

RQ-7 Shadow

A historically important tactical reconnaissance family; the US Army ended its RQ-7B programme in 2024, while other operators need separate status checks.

Role & capabilities

  • Tactical reconnaissance
  • Communications-relay configurations
  • Crewed–uncrewed collaboration heritage
See profileSee profile
Primary domain
Air
System type
Reconnaissance aircraft
Developer / manufacturer
AAI / Textron Systems
Origin / production countries
United States
Other names
No additional names recorded
Variants / configurations
RQ-7A; RQ-7B; RQ-7B V2; RQ-7B V2 Block III
Operators / programme customers
US Army (historical; programme ended March 2024)

Evidence & current status

Historical profile. US Army retirement does not establish the status of every overseas fleet; older service forecasts are not current evidence.

Shadow provided tactical reconnaissance to the US Army and allied forces for more than two decades. The family evolved through RQ-7A, RQ-7B and later V2 configurations, combining an observation payload, ground control and a launch-and-recovery support system. The later Block III introduced updated equipment and support for collaboration with crewed aircraft.

Its historical prominence should not be confused with a current US Army procurement opportunity. An Army account published in August 2025 states that the service ended the RQ-7B platform in March 2024 and describes the transition of former Shadow personnel to smaller uncrewed systems. Older manufacturer statements forecasting support far into the future were overtaken by that decision.

The specifications in this entry refer specifically to the RQ-7B V2 Block III manufacturer baseline. Earlier Shadows should not inherit its mass, payload or endurance values. The US Army decision likewise does not establish a retirement date for every foreign operator. Current overseas inventories and remaining support arrangements require country-specific evidence, while the family remains relevant as a historical reference for tactical-UAV development.

Sourced specifications

Figures apply to the named configuration. Maximum values are not guaranteed operating performance.

SpecificationReported valueContext & source
AirframeNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source ↗
Launch / recoveryNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source ↗
PropulsionNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source ↗
Dimensions6.2 m maximum wingspanRQ-7B V2 Block III baseline only. Source ↗
Mass243 kg gross take-off weightRQ-7B V2 Block III. Source ↗
Endurance8 hoursRQ-7B V2 Block III. Source ↗
RangeNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source ↗
SpeedNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source ↗
Altitude18,000 ft ceilingRQ-7B V2 Block III. Source ↗
Payload43 kgRQ-7B V2 Block III. Source ↗
SensorsNot established in the reviewed public sources.Public evidence gap. No estimate or neighbouring variant value has been substituted. Source ↗
Communications / navigation125 km line-of-sight rangeCommunications range for Block III; not flight distance. Source ↗

Publication history

  • — Added in the September 2026 global coverage review, with sources, configuration limits and explicit data gaps.

Suggest a correction to this entry →

Follow the evidence

Source types identify who makes the claim. Programme milestones and supplier statements should be read in context.

  1. Textron Shadow and Block III specification page (opens in a new tab)Manufacturer / programme
  2. US Army account of the Shadow transition, 5 August 2025 (opens in a new tab)Military / operator
  3. Textron Shadow programme history, 18 April 2024 (opens in a new tab)Manufacturer / programme

Explore the connections

Manufacturer indexAustralia / United States

Textron Systems

Aircraft and programme links: Aerosonde Mk. 4.7 / 4.8.

Reviewed 20 Sept 2026Read
Air · Coverage auditNorth America

North America defence drone coverage audit

3 original research topics reviewed: 0 resolved, 3 partially resolved and 0 still open. The remaining register identifies specific evidence needs.

Reviewed 21 Sept 2026Read